Manufacturing Process : 
Processing Process
- 01
    Stranding Strand drawn wires into stranded conductor  
- 02
    DC Resistance Measurement The measurement of the semi-finished conductor can avoid the low quality.  
- 03
    Insulation Extrude the conductor with the XLPE raw material surrounding it, material cross link under high- temperature and high-pressure, then cooled to be insulation.  
- 04
    Cabling The process to bunch several insulated conductors into one.  
- 05
    Metallic Shield Weave metal material surrounding the conductors to protect internal magnetic field  
- 06
    Sheath Extrude the cable after surround the semi-finished armored insulated conductors with melting PVC or PE.  
- 07
    Test Wires and Cables for Electrical Equipment are widely used in grid terminals, can be put into the market only after strict testing.  

 
						 
						 
						 Email: 623227522@qq.com
Email: 623227522@qq.com
							 Tel: +86-18637911633
Tel: +86-18637911633
							 Fax: 0379-67522688
Fax: 0379-67522688
							 Your position :
Your position : 